摘 要:介绍了溪洛渡水电站左岸泄洪洞无压段开挖支护施工方案。结合左岸泄洪洞无压段围岩物理力学参数、支护参数,利用phase2二维有限元分析软件对各开挖支护过程位移进行了数值模拟。模拟结果表明:地应力是引起位移的主要原因,地应力对位移的影响随开挖面的加大而不断重新分布并呈增大趋势。同时对施工期监测方案进行了介绍,对监测数据进行了分析。We introduce the construction schemes of excavation and support of free-flow spillway tunnel section in the left bank of Xiluodu Hydropower Station.In the combination of physico-mechanical parameters of surrounding rock mass at the free-flow spillway tunnel section and support parameters,a numerical simulation for the displacement of the surrounding rock mass in the excavation and support process is conducted by phase2 2-D finite element software.The simulation results show that geo-stress is the main cause of displacement,and the geo-stress redistributes and its influence increases with the increment of excavation area.The monitoring scheme in construction period is introduced and the data is analyzed as well.
关 键 词:泄洪洞 开挖支护 数值模拟 phase2 监测 溪洛渡水电站
分 类 号:TV65[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28