检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋洪胜[1,2] 刘国彬[1,2] 刘建航[1,2]
机构地区:[1]同济大学地下建筑与工程系 [2]上海地铁总公司
出 处:《建筑技术》1999年第2期80-82,共3页Architecture Technology
摘 要:软粘土深基坑开挖过程中的时空效应是客观存在的。上海地铁二号线某车站基坑工程在降水不理想的情况下,按常规作法挖至坑底时挡墙最大水平位移为101.46mm;而按时空效应法施工,挡墙的最大水平位移仅分别为63.78mm和55.7mm。由工况跟踪记录和挡墙横向位移的整理分析,揭示了基坑开挖过程中的时空效应规律,为软土基坑施工提供了可行的经验。The time-space effect during the soft-clay soil foundation deep pit excavation is an objective reality.According to the conventional construction method for a station of Shanghai Subway No.2 project being carried out at an undesirable dewatering situation,it has been found out that at their foundation beds,the retaining wall' s maximum displacement is 101.46 mm. Nevertheless,according to the time-space effect method,the retaining wall's maximum horizontal displacements are 63.78 mm and 55.7 mm respectively.Keeping pace with the investigation data and survey records,and making a comprehensive study of the retaining wall's transverse displacement,it has revealed the law of time-space effect during foundation pit excavation and provided practical experiences in this situation.
分 类 号:TU753.1[建筑科学—建筑技术科学] U231.4[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.79