检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]襄樊市交通规划设计院,湖北襄樊441000 [2]沪蓉西高速公路建设指挥部,湖北恩施445000 [3]华中科技大学土木工程与力学学院,湖北武汉430074
出 处:《城市道桥与防洪》2010年第5期90-93,共4页Urban Roads Bridges & Flood Control
摘 要:丹江口二桥是跨越南水北调工程——丹江口水库的一座特大桥,桥跨布置88.0m+150.0m+150.0m+88.0m,为预应力混凝土连续梁桥。桥墩基础为高桩承台,常年水位深达52.0m。2#墩桩长64m,桥面到桩底高度达到105.446m。该文介绍了该桥2#墩深水基础施工的主要过程。Danjiangkou No.2 Bridge is an overlarge bridge crossing Danjiangkou Reservoir which is the South-to-North Water Diversion Project.The bridge is a prestressed concrete continuous girder bridge of which the arrangement of the bridge span is 88.0m+150.0m+150.0m+88.0m.The pier foundations are the high pile base slabs.The perennial water depth is 52m.The length of No.2 pier pile is 64m.The height from the deck to pile bottom is 105.446m.The article introduces the main construction process of No.2 pier deep-water foundation of this bridge.
关 键 词:大跨 桥梁 深水基础 高桩承台 钢护筒 钻孔平台
分 类 号:U445.55[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15