检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]双流县水务局,四川成都610089 [2]中国水电顾问集团成都勘测设计研究院,四川成都610072 [3]四川大学水力学与山区河流开发保护国家重点实验室,四川成都610065
出 处:《四川大学学报(工程科学版)》2010年第3期36-42,共7页Journal of Sichuan University (Engineering Science Edition)
基 金:国家自然科学基金资助项目(50949057;50579040)
摘 要:水库修建后,改变了河道来水来沙条件,建成初期,由于泥沙被拦截在库内,下泄水流基本为清水,一般会对下游河道造成一定程度的冲刷调整。采用平面2维水沙数学模型研究了大渡河某水电工程修建后,对下游河道的清水冲刷影响,分析了水位、流速、河床冲淤等参数在常遇洪水作用下的变化。研究表明,清水下泄可以带来下游河道断面形态的调整,河床总体冲刷下切,流速分布趋于均匀,水位明显降低。Two-dimensional mathematical model of water and sediment was adopted to study the infection of erosion on the downstream river in Dadu River after a hydropower station had been built.Some parameters,such as water level,velocity,and erosion depth of river-bed were analyzed in the condition of usual flood.The result showed that rinsing discharge can lead to the adjustment in the downstream river cross-section morphology,the cutting in the overall of the riverbed,the uniform velocity distribution and the significantly decreasing of water level.
分 类 号:TV145[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166