天生桥一级水电站面板堆石坝施工导流与渡汛  被引量:1

Construction diversion of the concrete facing rockfill dam of Tianshengqiao First cascade Hydropower Station and its tiding over flood season

在线阅读下载全文

作  者:匡焕祥[1] 

机构地区:[1]长江水利委员会设计院

出  处:《水力发电》1999年第3期41-44,共4页Water Power

摘  要:天生桥一级水电站是我国在建最高的混凝土面板堆石坝,工程采用的施工导流标准、渡汛方式、导流程序是合理的。施工过程中采取了过流保护工程措施及安全渡汛调控管理,使工程按设计如期进行,大大简化了施工导流建筑物的规模,缩短了前期工期,节省了资金的投入。The Tianshengqiao First cascade Hydropower Station has the highest under construction concrete facing rockfill dam in China. The construction diversion standard, the way to tide over flood season and diversion program adopted by this project are reasonable. In the construction, the overflow protection engineering measures and the regulating and control management for safely tiding over flood season have been taken, which enable the project to be constructed on schedule according to the design. Meanwhile, it simplifies the size of construction diversion structure, shortens the period of antecedent works and saves the capital input.

关 键 词:施工导流 渡汛 过流保护 面板堆石坝 水电站 

分 类 号:TV551.1[水利工程—水利水电工程] TV641.43

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象