三峡工程二期截流戗堤口门宽度与通航研究  

Investigation on Width of Gap Region of Closure Dikes and Navigation through Gap During River Closure for Second Stage of Three Gorges Project

在线阅读下载全文

作  者:杨文俊[1] 孙家斌[1] 严伟[1] 

机构地区:[1]长江科学院

出  处:《武汉水利电力大学(宜昌)学报》1999年第1期14-17,22,共5页

摘  要:运用通航水力学及通航船模试验相结合的方法,综合分析了戗堤预进占口门宽度与口门区通航问题,从试验角度论证了预进占口门宽度能满足二期截流施工期长航船队通航要求。By means of navigation hydraulics and voyage tests with radio-controlled barge models, the problems of proper width between the pre-advanced banquettes and of navigation through the gap are analyzed comprehensively. It is proved that the width between the two pre-advanced banquettes can meet the requirements which are needed for the YNRMB's barge tow to navigate through during river closure. The rationalization of the width between the banquettes presented by designer, is also demonstrated.

关 键 词:口门区通航 明渠 口门宽度 截流 戗堤 三峡工程 

分 类 号:TV551.2[水利工程—水利水电工程] TV551.16

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象