葛洲坝大江电厂排沙孔进水口底槛磨损成因分析  

Analysis of Abrasion Causes at Inlet Bottom Sill of Desilting Outlet for Gezhouba Power Plant

在线阅读下载全文

作  者:刘敦煌[1] 江耀祖[1] 金峰[1] 

机构地区:[1]长江科学院水力学研究所,武汉430010

出  处:《长江科学院院报》2010年第6期23-25,48,共4页Journal of Changjiang River Scientific Research Institute

摘  要:针对葛洲坝大江电厂排沙孔进水口检修门槽底槛磨损问题,采用水下摄像方法,记录了发电运行时机组进水口流态和排沙孔进水口门砾石运动轨迹。根据观测得到水流特性以及砾石运动规律,分析了底槛磨损影响因素,提出了避免磨损的基本措施。Aiming at the problem of the abrasion at the bottom sill of emergency gate of desilting outlet of Gezhouba Power Plant,we recorded the flow state of the generator set inlet and the movement of sediment and gravels in the sediment-flushing inlet while the generator sets were running by the underwater photography.By observation,the character of the flow and the law of the sediment movement were gotten,the influencing factors of the abrasion at the bottom sill were analyzed,and some basic measures for avoiding abrasion were given.

关 键 词:葛洲坝 排沙孔 磨损 成因分析 避免磨损措施 

分 类 号:TV732[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象