检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《江西电力》2010年第2期12-14,40,共4页Jiangxi Electric Power
摘 要:输电网规划中不可避免地会涉及大量规划人员控制或预料之外的不确定性因素,合理的规划方法是将处理不确定性因素的方法与最优方法有机结合。针对电力市场环境下输电网规划面临大量不确定因素的影响,结合逐步扩展法,提出了采用半不变量法处理输电网规划中的不确定性因素。改进的"19节点系统"验证了所提方法的可行性。计算结果表明:所提方法的特点是计算速度快、且不存在不收敛问题。Transmission network planning inevitably involves a large number of unexpected uncertainties exceed planners' control or expectations.Therefore,a reasonable method of planning is an organic combining of handling uncertain factors with the optimal method.Because the transmission network is affected by uncertain factors in electricity market environment,the cumulant method combining with heuristic successively expanding method is proposed to deal with uncertain factors.The method was proved feasible through the modified 19-bus system.Also,the characteristics of the proposed method are fast calculation,and does not exist convergence problems.
关 键 词:电力系统 输电网规划 不确定性因素 半不变量法 逐步扩展法
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.8