检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京同创达勘测有限公司,北京100048 [2]河南省水利勘测有限公司,河南郑州450003
出 处:《北京测绘》2010年第2期84-85,共2页Beijing Surveying and Mapping
摘 要:通过近年来从事地下管线探测工作中,发现、总结管线点测量存在的质量问题以及所呈现出的规律性,结合测绘新技术、分析影响管线点测量质量的一些因素,从而使测绘生产单位进一步了解测绘产品生产过程中容易出现的质量问题,便于采取积极、有效的预防措施,使测绘产品质量进一步得到提高,做到对单位负责,对使用产品的用户负责。In this paper,quality problems in urban underground point surveying are concluded from years of underground pipeline detection experience.With newer survey technology and equipments,aspects that effect quality of pipeline point survey are analyzed.It is important for the survey companies to get a better understanding of quality problems in the process of surveying and mapping,thus they could take effective preventive actions to further improve the qualities of surveying products,and be more responsible for the users of the products.
分 类 号:P258[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.192