检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Department of Civil Engineering,Shanghai Jiaotong University
出 处:《Journal of Shanghai Jiaotong university(Science)》2010年第3期267-272,共6页上海交通大学学报(英文版)
摘 要:China National Stadium,also known as "Bird's Nest",is the main stadium of the 29th Olympic Games in Beijing in 2008,which has successfully held not only the Opening and the Closing ceremonies but also the track and field events.A new problem of rain preventing is brought out to improve the utilization of the Bird's Nest after the Olympic Games.The scheme of installing an air inflated membrane at the opening of the steel structure is proposed in this paper to solve the rainproof problem of the Bird's Nest.The form-finding and mechanical analyses of the air inflated membrane are carried out.Comparison between the mechanical performance and dynamical character before and after installing the air inflated membrane structure is given.To verify the analysis results,based on the practical structure of the Bird's Nest,a test of a 1:20 model membrane is worked out.China National Stadium, also known as "Bird's Nest", is the main stadium of the 29th Olympic Games in Beijing in 2008, which has successfully held not only the Opening and the Closing ceremonies but also the track and field events. A new problem of rain preventing is brought out to improve the utilization of the Bird's Nest after the Olympic Games. The scheme of installing an air inflated membrane at the opening of the steel structure is proposed in this paper to solve the rainproof problem of the Bird's Nest. The form-finding and mechanical analyses of the air inflated membrane are carried out. Comparison between the mechanical performance and dynamical character before and after installing the air inflated membrane structure is given. To verify the analysis results, based on the practical structure of the Bird's Nest, a test of a 1:20 model membrane is worked out.
关 键 词:China National Stadium rain proofing air inflated membrane model test
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15