武广高速铁路双线整孔简支箱梁预制技术  被引量:6

Prefabricating technology of double line whole-span simply supported box girder in Wuguang high speed railway

在线阅读下载全文

作  者:贾卫华 

机构地区:[1]中铁十六局集团第五工程有限公司,河北唐山063000

出  处:《铁道科学与工程学报》2010年第2期74-78,共5页Journal of Railway Science and Engineering

摘  要:武广铁路的900 t双线简支箱梁预制技术在国内首次应用,其预制工艺复杂。在现场施工过程中,针对大体积混凝土浇注的温度控制,混凝土的裂缝控制,张拉后的徐变控制等进行了机理分析和试验研究,其研究结果满足设计施工的各项技术要求,保证了武广高铁的正常运营。Wuguang high' speed railway is the first HSR in China which adopted 900 t double line simple box girder technique.In this paper,the temperature controlling requirement of mass concrete pouring,the crack controlling requirement of concrete and creep control after tension were analyzed by theoretical calculation and field test.The results show that the prefabricating technique used in Wuguang railway can satisfy the engineering requirements and guarantee the normal order of railway operation.

关 键 词:高速铁路 制梁 提梁 简支箱梁 

分 类 号:U416.1[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象