摘  要:土石方量计算是土地复垦项目工程设计的重点。论文针对高潜水位采煤沉陷区地形变化、复垦工艺和非平衡土石方量特点,提出了适用于该区土地复垦工程的土石方量计算与调整方法和计算流程,研究成果将有利于科学计算土地复垦施工工程量,以及实现沉陷区复垦工程中土石方量的快速、准确、简捷的自动计算。The cubic meter calculation of earth and stone is the key of the engineering design for the land reclamation project. According to the features of the topography variation at the mining subsidence area with high underground water table, the reclamation technique and the non - balanced earth and stone cubic meter, the paper provided the earth and stone cubic meter calculation and adjustment method as well as the calculation procedure suitable for the land reclamation project in the subsidence area. The study results would be favorable to the scientific calculation of the earthwork quantity for the land reclamation and to the rapid, correct and simple automatic calculation of the earth and stone cubic meters for the reclamation project in the subsidence area.

关 键 词:采煤塌陷地 复垦 土石方计算 

分 类 号:TD88[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象