高原复杂地质条件下固结灌浆施工参数选定  

Construction Parameters Selection of Consolidation Grouting Under Complex Plateau Geological Conditions

在线阅读下载全文

作  者:尚晓威[1] 邱敏[1] 

机构地区:[1]武警水电第二总队五支队,江苏常州213031

出  处:《施工技术》2010年第6期86-87,126,共3页Construction Technology

摘  要:新疆察汗乌苏水电站是新疆开都河流域上游规划建成的第三个梯级电站,由于察汗乌苏水电站右岸溢洪洞在开挖过程中多次出现不同程度的局部塌方,因此在固结灌浆施工前进行了固结灌浆试验,以此来调整灌浆各项参数。结合原现场试验和补充灌浆试验,介绍灌浆设计参数以及施工顺序。通过分析灌浆注入量、平均注水率以及单位注入量和质量检查成果,认为补充灌浆试验后的施工方法更为合理,保证了施工质量和安全。Xinjiang Chahanwusu Hydropower Station is the third cascade hydropower station in the upstream of Kaidu River in Xinjiang.It happens that different partial collapses for many times during the process of excavation at right-bank spillway in the hydropower station.Thus,consolidation grouting test is done before grouting construction to adjust all kinds of parameters.Based on original on-site test and supplementary grouting test,design parameters and construction sequence are introduced.The construction method with supplementary grouting test is more reasonable by analyzing injection amount,average water-injection rate,unit injection amount and quality check result.As a result,construction quality and safety are ensured.

关 键 词:水电站工程 高原地质条件 固结灌浆 施工质量 

分 类 号:TU753[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象