黄河西霞院水利枢纽泄水建筑物布置方案试验研究  

Experimental Study of Water Release Work Distribution Plan of Xixiayuan Hydraulic Key Project in the Yellow River

在线阅读下载全文

作  者:姚文艺[1] 田治宗[1] 王卫红[1] 王国栋[1] 

机构地区:[1]黄河水利科学研究院

出  处:《人民黄河》1999年第1期27-29,共3页Yellow River

摘  要:通过物理模型试验,从库区淤积形态、库区河势、枢纽回水对小浪底水库电站尾水的影响,以及坝下出流对下游温孟滩河段河道整治工程的影响等方面对黄河西霞院水利枢纽泄水建筑物布置方案的合理性进行了初步分析论证,为西霞院水利枢纽总体布置的规划设计提供了科学依据。Through physical model test, the rationality of flood-releaf construction distribution plan of the Yellow River Xixiayuan hydraulic key project has been primarily analyzed and demonstrated on the aspects of sedimentation morphology and river trend in the reservoir area, influence of the project backwater on tail water of Xiaolangdi reservoir hydropower station, influence of dam discharge on river control projects in the lower reaches of Wenmengtan, and so on, which provides scientific basis for the design and planning of overall distribution of Xixiayuan hydraulic key project.

关 键 词:泄水建筑物 布置方案 水利枢纽 水库 

分 类 号:TV65[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象