水布垭水利枢纽泄洪消能方案比较研究  被引量:4

Comparative Study on Schemes of Flood Discharge and Energy Dissipation for Shuibuya Project

在线阅读下载全文

作  者:黄国兵[1] 焦春文[1] 韩继斌 刘彩云 

机构地区:[1]水工研究所

出  处:《长江科学院院报》1999年第1期4-8,共5页Journal of Changjiang River Scientific Research Institute

摘  要:通过1∶165概化模型试验,探讨了适合该工程可能的消能型式。在1∶100整体模型和1∶88断面模型上分别研究了一级挑流消能方案和底流接挑流的二级消能方案的水力学特性,并结合溢洪道布置、工程量等对一、二级消能方案进行了综合比较,推荐一级消能方案为初设阶段的基本方案。According to the features with high head,large unit discharge and worse geological condition downstream spillway of the shuibuya project ,a 1∶165 scale generalized model is used to study different dissipaters so as to select a fit one for the project.Then a 1∶100 scale comprehensive model and a 1∶80 scale sectional models are used to study hydraulic properties of the flip bucket dissipater and the combired dissipater with a stilling basin and a flip bucket respectively,Finally,the singal staged bucket dissipater is proposed as primary scheme of dissipater fo design.

关 键 词:溢洪道 消能 水利枢纽 泄洪 

分 类 号:TV651.1[水利工程—水利水电工程] TV653

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象