检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:万建蓉[1]
机构地区:[1]河流研究所
出 处:《长江科学院院报》1999年第1期13-16,共4页Journal of Changjiang River Scientific Research Institute
摘 要:清江水布垭枢纽建成蓄水运用以后,将拦截坝址以上大部分悬移质泥沙及全部推移质泥沙,因此,库区将发生淤积。对清江水布垭枢纽推荐方案(400m~391.8m~350m)进行库区泥沙一维水沙数学模型淤积计算分析。计算成果表明,悬移质泥沙主要淤积在死库容内,对有效库容影响不大;水库运行至20年末遇频率5%及20%的洪水,泥沙淤积对洪水位的影响不明显。After completion and operation of the Shuibuya Project on the Qing jiang River ,most suspended load and entire bed load upstream of the dam will be retained and sediment deposition will occur in the reservoir area consequently .Calculation and analysis of reservoir sedimentation for the reservoir are carried out under the proposed scheme of operation(400m,391m,350m scheme )by means of 1 D flow and wdeiment mathematical model .The results show that the deposition of the suspended load mainly occurs in the dead storage and has little effect on the effective storage;the sediment deposition has no obvious effect on flood stage when 5% and 20% probability floods occurs at the end of 20 year operation of the Reservoir.
分 类 号:TV145.1[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31