机构地区:[1]国电新疆吉林台水电开发有限公司,新疆乌鲁木齐830002 [2]国电南京自动化股份有限公司,江苏南京210003 [3]北京华可实工程技术有限公司,北京100025
出 处:《水利水电技术》2010年第6期61-65,75,共6页Water Resources and Hydropower Engineering
摘 要:吉林台一级水电站混凝土面板堆石坝的坝体和面板在施工期及蓄水期的变形监测数据显示:坝体最大沉降量为77.1 cm,最大沉降率为0.948%。经分析得知,沉降主要大受坝填筑材料和水库蓄水的影响,且混凝土面板的垂直接缝、周边缝、钢筋应力、挠曲变形随水位抬升呈规律性变化,并与坝体内部变形监测数据相吻合。该监测数据为分析整体大坝变形形态提供了依据。The deformation monitoring data of both the dam body and the face slab of the concrete face rock-fill dam for Jilintai Hydropower Station I show that the max. settlement of the dam body is 77. 1 em with the max. settlement rate of 0. 948%. Through the relevant analysis, it is known that the settlement is mainly dominated by the impacts from both the filled materials and the impoundment of the reservoir, however, the vertical joint, peripheral joint, stress of reinforcement, flexual deformation of the concrete face slab are regularly changed, which are just coincided with the observed data of the internal deformation of the dam body. Those monitoring data can provide a basis for the analysis made on the deformation of the whole dam body.
关 键 词:混凝土面板堆石坝 填筑材料 变形监测 变形分析 吉林台一级水电站
分 类 号:TV698.1[水利工程—水利水电工程] TV641.4
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28