青溪水电站#2机组超出力发电可行性分析  被引量:4

Feasibility analysis of operation at excess output of unit No.2 in Qingxi Hydropower Station

在线阅读下载全文

作  者:刘远雄 

机构地区:[1]广东粤电青溪发电有限责任公司,广东大埔514200

出  处:《华电技术》2010年第6期55-56,60,共3页HUADIAN TECHNOLOGY

摘  要:介绍了青溪水电站#2机组的试验目的,阐述了#2机组的试验工况要求、试验步骤及测量参数,给出了试验结论及建议。青溪水电站增容改造后,既增加了发电量和调峰容量,又取得了显著的经济效益和社会效益。The test purpose of the unit No.2 of the Qingxi Hydropower Station was introduced.The requirements of the test condition,the test procedure and the measured parameters of the unit No.2 were expounded.The conclusion of the test and the suggestions were given.It was pointed out finally that after the capacity-enlarge reformation of the Qingxi Hydropower Station,not only the power generation and the peak shaving capacity were increased,but also the remarkable economical benefits and social effects were obtained.

关 键 词:水轮发电机组 超出力 可行性 效率 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象