综采工作面设备无坑木支护快速拆除实践  被引量:4

Fully Mechanized Coal Face Equipment Non-pit Prop Supporting Rapid Removal of Practice

在线阅读下载全文

作  者:赵晓辉[1] 

机构地区:[1]淮南矿业集团潘三矿,安徽淮南232096

出  处:《煤矿机械》2010年第7期186-187,共2页Coal Mine Machinery

摘  要:潘三矿17131(1)综采工作面,顶板条件相对较好,通过拆除条件的充分准备,拆除期间的顶板管理,在拆除液压支架的过程中,由传统的坑木支护改为无坑木支护,达到拆除的理想效果,实现了安全、快速拆除,节约了支护成本,为今后综采工作面的安全、高效拆除积累了宝贵的经验。Pansan 17131 (1) the mechanized mining face, roof conditions are better, through the removal of the conditions of well-prepared to dismantle the roof during the management, removal of hydraulic support in the process, from the traditional pit prop supporting conversion of non - mine timber bracing to achieve the desired effect removal to achieve a safe, quick demolition, the supporting cost savings for the future mechanized mining face of the safe, efficient removal of accumulated valuable experience.

关 键 词:综采工作面设备 无坑木支护 快速拆除 

分 类 号:TD82[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象