机场工程水土保持准入条件  被引量:5

Permitted requirements of soil and water conservation for airport construction projects

在线阅读下载全文

作  者:尉全恩[1] 南梅[1] 高智[1] 徐永年[2] 

机构地区:[1]中国水电顾问集团华东勘测设计研究院,杭州310014 [2]中国水利水电科学研究院,北京100048

出  处:《中国水土保持科学》2010年第3期64-66,共3页Science of Soil and Water Conservation

基  金:国家财政部;水利部2008专题"开发建设项目水土保持准入条件研究"(1260816153)

摘  要:机场建设项目占用土地大多为永久占地,对原地貌的扰动和土石方量较大,施工工期长,造成的水土流失和环境影响较大。在分析机场工程组成及其水土流失特点、占用资源特征、环境影响程度的基础上,根据有关法律法规、产业政策、行业规划、技术标准等规定和要求,提出机场建设项目水土保持准入的4项条件和机场项目水土保持方案准入的5项条件。The land occupation of airport construction projects is mostly permanent.The projects destroy the environment and led to a lot of soil and water losses,with a large number of excavation and filling of earth and stonework in the construction.Based on the analysis of the composition of projects,characteristics of soil and water losses,environmental impact,4 items of permitted requirements of soil and water conservation for construction projects and 5 items of permitted requirements of soil and water conservation for soil and water conservation plan are discussed according to china's relevant laws and regulations,policies,plans,standards and other regulations.

关 键 词:机场工程 水土保持 准入条件 

分 类 号:S157[农业科学—土壤学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象