钢-混凝土组合梁与钢筋混凝土柱连接节点的试验研究  

Experimental research on joint between steel-concrete composite beam and reinforced concrete column

在线阅读下载全文

作  者:许巍[1,2] 梁书亭[2] 陈林[3] 张根俞[2] 

机构地区:[1]东南大学建筑设计研究院,南京210096 [2]东南大学混凝土与预应力混凝土结构教育部重点实验室,南京210096 [3]北京市建筑设计研究院,北京100045

出  处:《建筑结构》2010年第6期48-50,共3页Building Structure

摘  要:依托实际工程,通过两个钢-混凝土组合梁与钢筋混凝土柱连接节点的缩尺模型试验,提出了以对拉钢筋代替钢梁翼缘穿过节点核心区的梁柱节点做法。试验证明,此类节点构造合理,传力可靠,施工方便,具有良好的承载能力和抗震性能。在试验研究基础上,提出了节点的抗剪承载力及构造措施,为该类节点的设计与施工提供参考。Based on a real case,design concept and constructional details of the joints between steel-concrete composite beam and reinforced concrete column were introduced through the experiment of two models,in which steel beam flanges were substituted with reinforcement in the case design of a conference building.The test results indicate that the joint is comparatively safe and rational.Shear capacity and construction methods are also advanced which provide reference for the project design and construction.

关 键 词:钢-混凝土组合梁 钢筋混凝土柱 节点 

分 类 号:TU398.9[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象