检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海现代建筑设计(集团)有限公司,上海200041
出 处:《建筑结构》2010年第6期56-59,共4页Building Structure
基 金:上海市科学技术委员会科研计划项目世博科技项目(08dz0580305);国家科技支撑计划项目世博科技项目(2009BAK43B06)
摘 要:上海世博轴索膜结构的设计经历了多种方案的比选。以世博轴特大型张拉索膜结构的设计过程为主线,采用非线性有限元方法对该项目各种方案的结构响应进行计算,分析比较了4个不同方案的结构受力和变形特征。在参考国内外相关规范的基础上,对安全系数取值、位移控制标准、等效风荷载取值问题做了深入探讨,总结出一套合理的设计方法。将非稳态计算得到的风荷载时程通过插值直接加载到有限元模型上进行动力时程分析,获得等效静力风荷载。Taking the design process of EXPO Axis cable-membrane structure as clue,the mechanical evolution and scheme development were discussed for the membrane structure.Various schemes had been proposed along with the analysis of structural response using nonlinear finite elements.Based on worldwide specifications,codes and papers,the value of safety factor,the controlling standard of displacement and the equivalent static wind load were discussed.By interpolating,the wind loads from CFD simulation were directly acted on the FEM nodes to calculate the dynamic responses in time domain.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.142.93