检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯召成 翟宜峰 HOU Zhao-cheng, ZHAI Yi-feng (Administration Bureau of Engineering Construction for Mid-route of the South-to-north Water Diversion Project, Beijing 100038, China)
出 处:《水利信息化》2010年第1X期40-45,共6页Water Resources Informatization
摘 要:在南水北调中线干线工程及调度运行管理基本情况的基础上,重点研究了南水北调中线干线自动化调度系统总体框架设计思路、系统总体需求,分析了5-程调度管理特点及业务流程,阐述了由应用系统、应用支撑平台、基础设施、组织管理、技术保障等5部分组成的系统总体框架。Through description about the mid-route project of the south-to-north water diversion project and their basic operation and management situation, this article presents a focus study on design ideas for general framework and general system demands of automatic dispatching system for the mid-route project. The article then makes an analysis on features of dispatching management and business process of the project, expounds the system general framework which consists of five parts: application system, application support platform, infrastructure, organization management and technology safeguard.
分 类 号:TV211[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222