检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉理工大学土木工程与建筑学院,武汉430070 [2]中南建筑设计院股份有限公司国际工程咨询管理中心,武汉430071
出 处:《建材世界》2010年第3期71-74,共4页The World of Building Materials
摘 要:哑铃形钢管混凝土拱桥在钢管拱肋灌注混凝土施工阶段可能出现缀板开裂。针对这一工程问题,结合实际工程项目,应用有限元软件ANSYS建立结构模型,对比分析结构各工况下的应力和变形,选择合理的施工方法和加固措施。而且对结构焊接位置的残余应力对结构受力的影响进行,分析中考虑材料非线性。研究表明,结构的焊接残余应力会大大降低结构的承载能力,在施工中应该考虑其影响。The dumbbell-shaped concrete filled steel tube arch bridge wound occur crack accident on the joint of steel tube and batten plate during concrete pumping stage.In view of this situation,the spatial finite element models were established.Through contrastive analysis of results under all consitions,the most reasonable construction method was choosed and some effective measure was adopted.Moreover,the effection of weleding residual stress was analysised.The nonliner behavior of steel was taken into account in analysis.It was suggested that weleding residual stress wound largely decrease load capacity of structure.
分 类 号:U441[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38