机构地区:[1]清华大学核能技术设计研究院管理工程专业,博士生北京100084 [2]清华大学核能技术设计研究院,研究员北京100084 [3]清华大学核能技术设计研究院技术设计研究院,研究员博士生导师北京100084
出 处:《系统工程》1999年第2期1-7,共7页Systems Engineering
摘 要:网络进度计划优化问题的研究主要以最短工期为优化目标,因而进度计划在财务方面对项目的影响被大大忽略略了.A.Russell提出以净现值作为优化目标,首先研究了现金流优化的网络进度计划问题.本文对该领域的研究文献进行了调研,分别概述了支付进度计划问题、资源约束问题以及时间-费用交换问题的研究情况和成果.The impact of scheduling on projects in financial aspect has been largely ignored because the majority of the project scheduling optimization research was developed with the objective of minimizing the duration of the project. It ia A. Russell who initiated the research on project scheduling problem with discounted cash flows and employed the net preset value as the optimum objective. In this paper,an invesigation of the related literature is carried out to summarize the research development on the payment scheduling problem, the resource-constrained problem and the time-cost tradeoff problem.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.114