拔桩时夹桩机构的静力分析  

Analysis on Static Force of Pile Clamping Mechanism Under Pile Pulling

在线阅读下载全文

作  者:周旭[1] 陈育荣[1] 孙传琼[1] 

机构地区:[1]湖北汽车工业学院机械工程系,湖北十堰442002

出  处:《湖北汽车工业学院学报》2010年第2期41-43,共3页Journal of Hubei University Of Automotive Technology

摘  要:对液压静力压桩机拔桩时夹桩机构和预制桩的静态受力进行了分析,得出的结论表明:拔桩时下钳口与预制桩之间的法向作用力大于上钳口与预制桩之间的法向作用力;拔桩时钳口与预制桩之间的法向作用力随着夹桩力的增大而增大,随着锥形楔块升角和夹桩机构内部钢与钢的静摩擦系数的增大而减小。The static forces of pile clamping mechanism of hydraulic static pile driver and pre-fabri- cated pile under pile pulling were analyzed. The results show that the perpendicular acting force be- tween lower pile clamping jaw of pile clamping mechanism and pre-fabricated pile is greater than the perpendicular acting force between upper pile clamping jaw and pre-fabricated pile under pile pulling; the perpendicular acting force between pile clamping jaw of pile clamping mechanism and pre-fabricated pile is increasing gradually by adding properly pile clamping force under pile pulling; the perpendicular acting force between pile clamping jaw of pile clamping mechanism and pre-fabri- cared pile is reducing by augmenting becomingly the angle of pile clamping block and static friction coefficient between internal steel and steel of pile clamping mechanism under pile pulling.

关 键 词:拔桩 夹桩机构 静力 液压静力压桩机 

分 类 号:TU501[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象