检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋奇[1]
出 处:《技术经济》2010年第6期40-44,106,共6页Journal of Technology Economics
摘 要:已有关于火电项目风险的研究基本未重点考察现金流量风险。本文从火电项目融资的角度出发,发现现金流量风险的重要性,尝试性地运用复杂科学管理系统思维的工具——探索图,为火电项目的建设期、试生产期和生产运营期分别建立风险评估指标体系,并用动态模糊评价方法确定每期和全过程的现金流量风险程度,为火电项目融资决策提供依据。The existing research on thermal power project risks almost does not focus on examining the cash flow risk.From the perspective of thermal power project financing,this paper finds out the importance of cash flow risk,and tries to apply the complex scientific management's systems thinking tool,the exploring graph for the thermal power project in the construction period,trial production period and production period to respectively establish risk assessment indicator systems.And with dynamic fuzzy evaluation method,this paper evaluates the degree of every process and whole process' cash flow risk,and provides some basis for decision making to the thermal power project financing.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.94