作 者:史光宇[1] 刘牧冲[1] 刘清利[1] 匡启兵[1]
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2010年第7期1-4,共4页Water Resources & Hydropower of Northeast China
摘 要:旁多工程坝基覆盖层深厚,防渗面积大,且处于4000m以上的高海拔地区。因此,坝基防渗形式的选择合理与否是个关键问题。为此,通过比较灌浆帷幕、混凝土防渗墙、上墙下幕以及悬挂式防渗墙等方案,从防渗可靠性、施工技术条件、电力资源损失、运行检修条件及工程投资等诸多方面进行了综合比较,优选出坝基防渗的最佳方案。The Pangduo hydro project has deep overburden and large anti-seepage area,which is located in the high altitude area more than 4000m.Therefore,how to reasonably select the anti-seepage pattern of dam founda-tion is the key to the problems.By comparing these schemes of the curtain grouting,the concrete anti-seepage wall,upper wall and down curtain,hanging type anti-seepage wall,etc.the paper selects the optimum scheme of dam foundation anti-seepage by the comprehensive comparison from the many aspects of anti-seepage reliability,construction technology conditions,power loss,operation and maintenance conditions,project investment,etc.
分 类 号:TV223.4[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.132.123