检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:牛元立[1] 罗汉武[1] 熊浩清[1] 宋宁希[1]
出 处:《陕西电力》2010年第6期36-39,共4页Shanxi Electric Power
摘 要:探讨了火电厂与抽水蓄能电站联合运行模式。分析了该模式的技术及经济可行性,并以宝山发电厂与宝泉抽水蓄能电站的联合运行为例,探讨了联合运行方案所产生的发电效益、节煤效益以及经济效益。对比发现,联合运行模式可有效降低抽水蓄能电站的上网电价,同时有助于系统节能减排的实现。Aiming at maximum utilization of pumped storage power station,stable economic operation of power system,joint operation mode is suggested.This paper analyses the joint mode of thermal power plant and the pumped storage station in the view of technology economy.Then by taking Baoquan pumped storage station as an example,comparison analysis is made between conventional operation mode and joint mode regarding generation benefit,coal-saving benefit and economy benefit as well.Result shows that joint operation can considerably bring down pool purchase price,and has obvious contribution on energy-saving and emission reduction.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145