检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东交通大学土木建筑学院,江西南昌330013
出 处:《工程管理学报》2010年第3期323-326,共4页Journal of Engineering Management
摘 要:建设项目管理信息系统(PMIS)的发展并不成熟,其开发可能遇到技术、管理等多方面的风险。系统开发的管理者由于缺乏经验,对风险因素的管理主观、零散且盲目,导致开发项目的失败。本文综合层次分析法和模糊评估法对风险因素发生的概率、发生后的影响程度和综合影响程度进行量化,为管理者控制风险提供依据。The development of project management information system (PMIS) for construction projects is not mature which encounters the risks in technology and management. The lack of risk management experiences for system managers whose attitudes to risk factors tend to be subjective, scattered and blind results in the failure of projects development. This paper integrated the analytic hierarchy process with fuzzy comprehensive evaluation method to quantify the probability of risk factors occurrence, the impact after risk occurrence and the comprehensive influence, which provides the basis for risk control for the managers.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.173