四川电网黑启动恢复控制研究及试验(二)——频率、并网控制及二次设备配置  被引量:7

Research and experiment of restoration control during Sichuan power grid black-start (2):frequency,paralleling-in control and secondary equipment configuration

在线阅读下载全文

作  者:杨可[1,2] 刘俊勇[1] 贺星棋[1] 刘柏私[2] 

机构地区:[1]四川大学电气信息学院,四川成都610065 [2]四川电力调度中心,四川成都610041

出  处:《电力自动化设备》2010年第7期34-39,共6页Electric Power Automation Equipment

摘  要:在四川某电网黑启动现场试验的基础上,对黑启动期间孤网系统的频率、并网控制及相应二次设备的调整进行了分析。在考虑发电机组一次调频及负荷频率调节效应的基础上,根据系统的运行方程推导出负荷恢复后的频率降落公式;同时,结合实际中二次设备的配置原则及保护动作原理对黑启动期间二次装置的适应性和电网的抗干扰性分别进行讨论,并从使其最有利于系统恢复的方面提出了相应的调整及配置原则。The frequency of isolated grid during black-start,the paralleling control and the corresponding adjustment of secondary equipment are analyzed based on the site black-start experiment of a regional grid in Sichuan.With the consideration of the generator primary frequency regulation and the load frequency regulation,the formula of frequency descent after load restoration is deduced according to the system operation equations.Combined with the actual configuration principle of secondary equipment and the action principle of protections,the adaptation and anti-interference of secondary equipment during black-start are discussed respectively and the corresponding principles of adjustment and configuration are proposed for optimal system recovery.

关 键 词:黑启动 频率稳定 并网 保护配置 恢复控制 

分 类 号:TM732[电气工程—电力系统及自动化] TM774

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象