检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Xi'an Hi-technology Institute
出 处:《Defence Technology(防务技术)》2010年第2期155-160,共6页Defence Technology
摘 要:The task of maintenance organization is very heavy at wartime.The usability of armaments may be greatly improved by efficient task scheduling.In order to recover the battle effectiveness of units in battlefield as fast as possible,dynamic maintenance scheduling models with subject taken into account were built on the basis of analysis the feature of maintenance task.Maintenance task scheduling problem is very complicated.So it is decomposed into two sub-problems:static maintenance task scheduling and dynamic maintenance task scheduling problem with subject taken into account.Corresponding mathematic models were built to these sub-problems and their solutions were proposed.Dynamic maintenance task scheduling with subject taken into account is on the basis of static maintenance task scheduling.With the task changing in battlefield,dynamic task scheduling can be realized by repeatedly call of static maintenance task scheduling with subject taken into account.The experimented results show that dynamic maintenance task scheduling method with maintenance subject taken into account is valid.The task of maintenance organization is very heavy at wartime. The usability of armaments may be greatly improved by efficient task scheduling. In order to recover the battle effectiveness of units in battlefield as fast as possible, dynamic maintenance scheduling models with subject taken into account were built on the basis of analysis the feature of maintenance task. Maintenance task scheduling problem is very complicated. So it is decomposed into two sub-problems: static maintenance task scheduling and dynamic maintenance task scheduling problem with subject taken into account. Corresponding mathematic models were built to these sub-problems and their solutions were proposed. Dynamic maintenance task scheduling with subject taken into account is on the basis of static maintenance task scheduling. With the task changing in battlefield, dynamic task scheduling can be realized by repeatedly call of static maintenance task scheduling with subject taken into account. The experimented results show that dynamic maintenance task scheduling method with maintenance subject taken into account is valid.
关 键 词:military operation research maintenance SCHEDULING OPTIMAL model
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.165.81