检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中建钢构有限公司,广东深圳518040 [2]中建三局建设工程股份有限公司,湖北武汉430064 [3]中建三局建设工程股份有限公司工程总承包公司,湖北武汉430064
出 处:《施工技术》2010年第7期10-12,共3页Construction Technology
基 金:国家科技支撑计划项目--建筑结构高效施工关键技术研究(2006BAJ01B04-05)
摘 要:武汉火车站中央站房空间网壳结构屋面采用大型滑移胎架、高空原位安装法施工。介绍在施工工期紧张及结构形式特殊等因素影响下,支承胎架的设计。长41.1m,宽32.875m,高52m,单部胎架重2740t的大型滑移胎架由滑移胎架、跨搭式桁架、钢支柱和檩条式桁架组成。对大型胎架进行了动力和静力分析,计算结果表明胎架的承载力、变形和稳定性满足规范要求。The central station building of Wuhan Railway Station uses space reticulated shell roof which is constructed by sky-high in-situ installation method with large movable jig. The authors show the design of this support jigs on the condition of short construction period and special structure style. The large movable jig, with 41. lm length, 32. 875m width, 52m height and 2 740 tons weight, consists of movable jig, cross-lapped truss, steel support columns and purlin-style truss. Dynamic and static analysis on this jig shows that load capacity, deformation and stability of this jig can satisfy code requirements.
分 类 号:TU758.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222