超大型沉井降排水下沉施工  被引量:3

Water dredging construction method of the super scale caisson

在线阅读下载全文

作  者:夏国星[1] 杜洪池[2] 

机构地区:[1]江苏省长江公路大桥建设指挥部,江苏泰州225321 [2]中交第二公路工程局有限公司,西安710065

出  处:《中国工程科学》2010年第4期25-28,共4页Strategic Study of CAE

基  金:交通行业联合科技攻关项目(2008-353-332-160)

摘  要:泰州大桥北锚碇沉井基础长67.9m、宽52m、高57m,在沉井下沉的初期,采用降排水下沉。降排水下沉施工成本相比不排水下沉低,且下沉效率高,易控制,可形成良好的下沉导向,并确保沉井的下沉速度和精度,适宜在粉细砂、软塑性亚黏土等地质条件下采用。文章以泰州大桥北锚碇沉井基础为例,介绍了超大型沉井降排水施工的降排水下沉施工工艺。The dimension of the north anchorage of Taizhou Bridge is 67.9 m long,52 m wide and 57 m high.The water dredging method was adopted at the beginning of the sinking process.The cost of water dredging method is lower than the un drained dredging method and the efficiency is much higher and more controllable.This method can form good sinking direction to assure the sinking velocity and preciseness,especially suitable for the geological condition of clay and clayey.This paper introduced the water dredging construction method of the super scale caisson based on the north anchorage of Taizhou Bridge.

关 键 词:超大型沉井 降排水施工 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象