检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄利锋[1,2] 冯健[1,2] 赵建[1,2] 张晋[1,2] 蔡建国[1,2] 盛平[3] 甄伟[3] 陈翠
机构地区:[1]东南大学混凝土及预应力混凝土结构教育部重点实验室,江苏南京210096 [2]江苏省预应力工程技术研究中心,江苏南京210096 [3]北京市建筑设计研究院,北京100045 [4]联安国际建筑设计有限公司,北京100048
出 处:《建筑结构学报》2010年第7期110-117,共8页Journal of Building Structures
基 金:国家自然科学基金项目(50478075);江苏省自然科学基金(BK2006104)
摘 要:新广州站站房屋盖采用一种新型预应力索拱-内凹式索拱结构,为了解该种结构的张拉成形过程、典型荷载工况下结构性能和结构极限承载力及破坏位置,分张拉成形、4种荷载工况的加载及2种典型荷载工况的极限加载3个阶段,对2榀内凹式索拱的1/3缩尺模型进行了静力试验,并将试验结果与有限元结果进行对比,有限元结果和试验值吻合较好。研究结果表明:张拉成形后索力和位形基本达到目标,确立的张拉原则可行,给出了快速确定初始张拉力的计算公式;设计工况下结构处于线弹性阶段,满跨分布荷载时主拱全截面受压,以受轴压力为主,而半跨分布荷载时以受弯为主,弯曲应力在主拱应力中的比重较大;半跨分布荷载对结构整体稳定最不利,其极限承载力较满跨分布荷载降低较大,前者在主拱弯矩最大的位置破坏,而后者在轴压力最大的拱脚附近破坏;索夹的连接形式及支座的抗推刚度对结构的承载能力影响很大。A new type of prestressed cable arch-inner concave cable arch structure is applied in the roofs of the New Guangzhou Railway Station. In order to understand configuration erection by tensioning cables, performance under load cases, ultimate loading capacity and failure position of this structure, two 1/3 scale models were tested in three phases of configuration erection by tensioning cables, applications of four load cases and ultimate load tests by two typical load cases. Experimental results were compared with those of the FEM analysis. The results show that the theoretic value and the experimental value match well, and the cable tensile force reaches target value basically after formation erection. A formula for the determination of the initial tensile force is proposed. The models under design load cases are in linear elastic stages. The forced state of the arch under full span load cases is dominated by axial compression, while that of the arch subjected to half span load cases is controlled by moment. The half span load case is identified as the worst for over stability with the least ultimate loading capacity. Failure under half span load case occur in maximum moment while failure under full span load case occur near the foot of arch where axial compression forces are the largest. The connection form of cable clamp and the beating stiffness of the support have a great influence on structural bearing capacity.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15