检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《上海地质》1990年第3期38-45,共8页
摘 要:本文通过南市区西陵高层打桩施工的实例,分析了各种打桩防护措施的作用和效果。认为打桩对周围环境产生的公害是一个动态过程。因而,根据场地的工程地质条件和打桩的进程,配以适当的防护工作量,并根据打桩过程中场地孔隙水压力和地基土变形的规律及时调整打桩流水的情报化施工方法,降低了防护费用,并可大大减少对周围环境的影响。This paper presents an analysis of the functions and effects of various protective measures for piling through the example of the piling and construction of Xi-ling high-rise in Nanshi District. The public calamity made by piling to the surrounding environment is a dynamic process. Based on the engineering geological conditions of the site and the piling process with suitable amount of protective work, and on the pore water pressure of the site during piling and the regularity of deformation of the foundation soil, the feed-back construction method of the in-time rearrangement of the piling process reduces the protection expenses and its effect on the surrounding environment.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.151