某地铁隧道盾构机始发阶段地面塌陷原因分析  被引量:9

Cause Analysis on the Ground Collapses during the Launching Period of a Metro Shield

在线阅读下载全文

作  者:马汉春[1] 王旭[1] 由伟[1] 车平[1] 

机构地区:[1]北方重工集团盾构机分公司,沈阳110141

出  处:《现代隧道技术》2010年第3期76-80,共5页Modern Tunnelling Technology

基  金:国家高技术研究发展计划(863计划)(2007AA041806);国家科技支撑计划(2007BAF09B01)

摘  要:某地铁隧道在盾构机始发后的半个月内连续发生了三次地面塌陷。基于工程地质条件,结合地面监测资料和盾构机掘进时的运行状况,文章对这三次地面塌陷发生的原因进行了分析,并总结提出了盾构机始发过程中在各个方面应该注意的问题,以避免类似问题的发生。另外,文章也探讨了盾构法隧道施工工程地质问题与传统隧道施工工程地质问题发生机制的不同之处。In a metro jobsite,there occurred three continuous ground collapses during the fifteen days after the launching of the shield.According to the site geological condition,ground subsidence monitoring data and the machine working state,reasons for these three ground collapses have been analyzed in this paper.In order to avoid the similar problem to occure again,experiences during the launching period of a shield are summarized in this paper.The geological problems occurred for the conventional tunneling method and that for shield tunneling method are different in mechanism,and the differences are discussed in this paper.

关 键 词:地铁隧道 盾构机 始发阶段 地面塌陷 原因分析 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象