境外电源BOT项目风险管理研究  被引量:4

Risk Management Research for International Power BOT Project

在线阅读下载全文

作  者:李晓军 华栋[2] 侯建朝[3] 

机构地区:[1]南方电网国际有限责任公司,广州510623 [2]华南理工大学电力学院,广州510641 [3]上海电力学院经济与管理学院,上海201300

出  处:《华东电力》2010年第6期835-839,共5页East China Electric Power

基  金:国家自然科学基金项目(70673023)

摘  要:介绍了中国电力企业开发境外电源项目采用建设—运行—移交方式的基本概念。以境外电源BOT项目为例分析了境外电源项目风险具有的阶段性、复杂性和长期性等特性。从项目开发、项目建设、项目运营和项目移交等4个阶段对境外电源BOT项目风险进行了研究,并对影响境外电源BOT项目开发的政治、建设、生产、市场和金融等主要风险提出了规避策略。The basic concepts in Chinese power enterprises of constructing,operating and handover project were introduced.The international power project was taken for the BOT project as an example to analyze the international projects which have the characteristics of stage,complexity and long term.The international power BOT project risk was researched from the four stages of project namely development,project construction,project operation and project transaction.The avoiding strategy was proposed for the main risk in politics,construction,production,market and finance,which affected the international power BOT project.

关 键 词:境外投资 电源项目 风险识别 规避策略 

分 类 号:TM73[电气工程—电力系统及自动化] F283[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象