天桥水电站面流界限水深研究  

Study on the Surface Flow Critical Water Depth of Tianqiao Hydropower Station

在线阅读下载全文

作  者:王鹏涛[1] 于国辉[1] 赵海镜[2] 孙东坡[1] 

机构地区:[1]华北水利水电学院,河南郑州450011 [2]中国水利水电科学研究院,北京100044

出  处:《华北水利水电学院学报》2009年第5期13-16,共4页North China Institute of Water Conservancy and Hydroelectric Power

基  金:黄河天桥水电站除险加固工程项目(HSY-SL-194)

摘  要:通过天桥水电站除险加固工程水工模型试验,推导出了面流界限水深理论和经验计算公式,并与前期研究成果进行了对比.分析了面流界限水深的影响因素,发现当鼻坎挑角由0°变化到15°,面流界限水深逐渐降低;在护坦加长和下游水流空间性的双重影响下,面流界限水深值增大;降低河床高程或增大坎高,面流发生范围将会扩大.Through hydraulic model test of Tianqiao hydropower station reinforcing project,the theoretical equation and empirical equation of the surface flow critical water depth had been researched and compared with others.Some factors affected the change of surface flow pattern and critical water depth had been analyzed.It was found that the change of critical water depth values was neglect when nose angle changed from zero degree to fifteen degrees,lengthening the protection-apron and flow expansion result in the ascent of critical water depth values,the critical water depth values would descend if the bed level is reduced,or the nose height is increased.

关 键 词:天桥水电站 水工模型试验 面流界限水深 水力计算 影响因素 

分 类 号:TV135.1[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象