检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北水利水电学院水利职业学院,河南郑州450011 [2]华北水利水电学院,河南郑州450011 [3]中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550081
出 处:《华北水利水电学院学报》2009年第6期89-91,共3页North China Institute of Water Conservancy and Hydroelectric Power
摘 要:对郑州市某大型深基坑进行桩锚与土钉联合支护设计,应用FLAC3D软件对桩锚与土钉联合支护过程进行数值模拟,对各开挖过程中基坑位移场和土钉锚杆等结构单元的受力变化进行分析,模拟结果与设计计算结果基本吻合,数值模拟结果有效地指导了设计计算和现场施工过程.In order to understand goodly the reinforcement mechanism of the pile-anchor and soil nailing combined structure,optimal design and numerical simulation for a large deep excavation pit with pile-anchor and soil nailing in Zhengzhou city were done,the process of pile-anchor and siol nailing combined supporting was numerically simulated by the software FLAC3D,the displacement field of the pit and the change of the stress of siol-nail-anchor structure cell were analyzed.The simulation results were basically consistent with the design calculations results.The results of numerical simulation had effectively guidance to design and calculate,and in-site construction process.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.192