检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:任岩[1] 鲁改凤[1] 王龙 张武斌[3] 李兴易
机构地区:[1]华北水利水电学院,河南郑州450011 [2]西北勘探设计院,陕西西安710065 [3]三门峡黄河明珠集团有限公司水力发电厂生计科,河南三门峡4720002 [4]四川二滩国际工程咨询有限责任公司,四川成都610072
出 处:《水力发电》2010年第4期57-59,共3页Water Power
基 金:水利部"948"计划技术创新推广转化项目(CT200207)
摘 要:黄河中下游属多泥沙河段,其上水电站的水轮机普遍受到泥沙磨蚀的严重危害,水电站的检修比一般水电站更加复杂。而传统的检修体制存在着检修科学依据不足、维修不足等缺陷。为此,建立了黄河上水电站水轮机磨蚀状态检修系统,以提高检修和管理效率,延长设备大修间隔,降低小修频率,杜绝水轮机维修不足的现象,提高设备的可利用率,从而降低发电成本。The hydraulic turbines on the middle and lower reaches of Yellow River are severely abraded because of the high sediment concentration.The regular overhaul system for abraded turbine has some defects,such as lack of scientific basis for repair,insufficient repair and others.A new condition-based overhaul system for abraded turbine was established,and it can improve the overhaul efficiency,extend equipment overhaul intervals,lower the times of periodic repair,eliminate the shortage of turbine maintenance,improve equipment utilization rate and reduce the cost of generation.
分 类 号:TK730.8[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.237.242