检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李树山[1,2] 解伟[2] 魏鹏[2] 闫飞[2] 张世宝[2]
机构地区:[1]郑州大学环境与水利学院,河南郑州450002 [2]华北水利水电学院,河南郑州450011
出 处:《水力发电》2010年第5期76-78,共3页Water Power
基 金:国家自然科学基金项目(50779018);河南省科技创新杰出人才计划(094200510011);河南省创新型科技团队支持计划
摘 要:对蒲石河电站大型预应力混凝土闸墩结构进行仿真模型试验研究。根据模型试验测试和有限元计算结果,分析不同的预应力筋张拉工序对闸墩颈部预压效果的影响规律,确定合理的预应力筋张拉工序;研究双侧弧门关闭工况下闸墩颈部受力状态;研究在单侧弧门关闭工况下闸墩结构的超载能力,提出需要改进的结构设计建议。The model test for Pushihe Pumped Storage Power Station pre-stressed concrete pier was carried out and the numerical simulation was conducted by three-dimensional finite element.The reasonable tension procedure is proposed after analyzing the effect of different strands tensioning procedure on pier neck stress.The improvements on pier structure design are proposed after analyzing the pier neck stress under the operating condition of two ace gates closed and the over-load capacity of pier structure under the operating condition of single ace gate closed.
关 键 词:闸墩 预应力混凝土 模型试验 应力 超载能力 蒲石河抽水蓄能电站
分 类 号:TV32[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3