检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马春宝[1] 刘贵满[1] 张世民[1] 桂烈亭[1] 廖洪波[1]
出 处:《石油化工应用》2010年第7期17-20,共4页Petrochemical Industry Application
摘 要:锦45块是辽河油田最大稠油区块,2008年优选该块构造发育较为完整的9个井组,将其作为Ⅱ类稠油油藏进行蒸汽驱先导试验,通过借鉴齐40块Ⅰ类稠油油藏成功汽驱经验和做法,并充分结合区块本身的实际特点,通过严格保证注汽质量及强化提高采注比等措施手段,经过1年多的汽驱生产,大多数油井明显受效,蒸汽腔正逐步延伸扩展,试验进入蒸汽有效驱替阶段,试验区日产液、日产油明显上升的同时,地层压力保持稳定,油层温度普遍上升,采注比、油汽比不断提高,试验初步证明在锦45块Ⅱ类稠油藏实施蒸汽驱开发,在技术及经济上均是可行的,将会为辽河油区1.8亿吨Ⅱ类稠油储量的汽驱开发起到重要指导和借鉴作用。Jin45 Block is largest heavy oil block in the Liaohe Oilfield. In 2008, 9 well groups whose structural development are much entire were optimized to do pilot test of steam flooding as type Ⅱ heavy oil reservoir. By drawing lessons from the experience and method during the success steam flooding in the type Ⅰ heavy oil reservoir of Qi40, and fully combining with the actual characteristics of this block itself, through strictly guarantee injected steam quality and strengthen enhancing effective injection to production ratio and so on, after the production by steam flooding over 1 year, most oil wells were obviously affected, steam chamber is getting to extend, and the test enter the effective displacing stage; the daily liquid rate and oil rate obviously increase in the test region, at the same time, formation pressure keep stable, oil layer temperature generally increase, production to injection ration and oil to steam ratio continues increase. The test preliminary prove that it is feasible in technique and economic to implement steam flooding in the type Ⅱ heavy oil reservoir as Jin45 block.this will provide important instruction and references for the steam flooding in such type Ⅱ heavy oil reservoir with 1.8×10^8 t in Liaohe oil province.
关 键 词:蒸汽驱 Ⅱ类稠油油藏 锦45块 先导试验 辽河油田
分 类 号:TE357.44[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26