检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《混凝土与水泥制品》2010年第4期66-68,共3页China Concrete and Cement Products
基 金:江苏省自然科学基金(BK2007585);江苏省教育厅自然科学研究项目(06KJB560037)
摘 要:和预应力钢筋混凝土一样,预应力砌体也会发生预应力损失。因此,确定各个阶段的预应力损失值是进行预应力砌体结构设计的基础。通过试验研究了预应力砌块砌体的预应力损失随时间的变化规律,测试了各个阶段以及最终的预应力损失量。结果表明,预应力砌块砌体的预应力损失值不大,且前期发展较快。详细分析了预应力砌块砌体结构中预应力损失的各个组成部分,研究了预应力损失各个组成部分的大小和发展阶段。在此基础上,提出了预应力砌块砌体预应力损失的计算公式和总损失值。There is prestressed loss in prestressed masonry just like prestressed reinforced concrete.Determining prestressed loss value in each phase is the base of structure design of prestressed masonry.The variation law of the prestressed loss of prestressed block and masonry by time is studied through experiment,and the prestressed loss in each and final phase is tested.The results indicate that the prestressed loss value of prestressed block and masonry is small,and it develops quickly in early stage.Each component of prestressed loss in prestressed block and masonry structure is analyzed,and the value and development phase of each component of prestressed loss is researched.On this base,calculation formula of prestressed loss of prestressed block and masonry and total loss value is proposed.
分 类 号:TU522[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.132.108