循环泵启动瞬间排水系统壅水数值模型分析  被引量:1

Numerical model analysis of backwater of a drainage system upon instantaneous startup of a circulating pump

在线阅读下载全文

作  者:高坤华[1] 张成义[1] 胡亦工[1] 徐士倩[1] 郑冠军[1] 王伟[1] 

机构地区:[1]山东电力工程咨询院,山东济南250013

出  处:《山东大学学报(工学版)》2010年第4期138-143,共6页Journal of Shandong University(Engineering Science)

摘  要:该文结合山东华能日照电厂二期(2×680MW)工程运行调试中遇到的循环泵启动瞬间排水系统壅水较为严重的问题,运用数学模型计算对直流循环排水系统壅水现象进行分析,得出了循环水排水井井顶、虹吸井井顶的计算设计标高,提出了减少壅水的改进措施,为以后直流循环排水系统减少壅水设计提供经验。Combined with the problems that backwater of drainage system upon instantaneous startup of a circulating pump seriously existed in commissioning and operation of Shandong Huaneng′s Rizhao Power Plant Phase II Project(2×680MW),the backwater drainage system of DC circulating water was analyzed by using a mathematical model calculation.Then the calculation design elevation of the well top of the drainage well and siphon well were obtained,and some improvement measures on reducing backwater were proposed,which could provide experiences for reducing backwater on future designing of a DC circulating water system.

关 键 词:循环泵启动瞬间 数学模型 排水系统壅水 直流循环 改进措施 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象