检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中北大学,山西太原030001 [2]太原大学,山西太原030009
出 处:《工业水处理》2010年第8期43-46,共4页Industrial Water Treatment
基 金:太原市2007科技发展计划项目(070332)
摘 要:实验考察了膨胀颗粒污泥床(EGSB)反应器处理焦化废水的启动运行特点。先以COD为500~2 000mg/L的啤酒废水培养颗粒污泥,35 d的时间COD去除率达90%左右;再用焦化废水和啤酒废水的混合液驯化颗粒污泥,并逐步提高焦化废水所占的比例,约6个月的时间反应器对COD为2 000 mg/L左右的焦化废水的COD去除率稳定在55%,且颗粒污泥的性能良好,可以认为启动工作完成。The characteristics of the start-up operation of lab-scale EGSB reactor for treating coking wastewater have been investigated.When the granular sludge is cultivated with brewery wastewater whose COD is 500-2 000 mg/L,the COD removal rate reaches about 90% in 35 d.Then,the granular sludge is acclimatized with the mixture of cok-ing wastewater and brewery wastewater.The COD proportion of coking wastewater is increased gradually.Within 6 months or so,the COD removal rate of 2 000 mg/L coking wastewater remains on 55% steadily in the reactor.The ca-pability of granular sludge is favorable and the start-up operation has thus been finished.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.31.133