检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大庆石油管理局采油工艺研究所
出 处:《石油钻采工艺》1999年第3期103-104,共2页Oil Drilling & Production Technology
摘 要:This technique can be described as follows: combine the fracturing technology and the chemical water shutoff technology, form artificial compartment in thick reservoir, change the water flood condition, and thus produce more oil from it. While conducting, the requirements for the pipe string technology are strict: the sticking distance must be short, the fracture must be located; the pipe string should not only meet the requirements of fracturing technology, but also of waiting-on water shutoff technology.This technique can be described as follows: combine the fracturing technology and the chemical water shutoff technology, form artificial compartment in thick reservoir, change the water flood condition, and thus produce more oil from it. While conducting, the requirements for the pipe string technology are strict: the sticking distance must be short, the fracture must be located; the pipe string should not only meet the requirements of fracturing technology, but also of waiting-on water shutoff technology.
分 类 号:TE931.02[石油与天然气工程—石油机械设备] TE934.202
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117