检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邵杰
机构地区:[1]上海煤气第一管线工程有限公司
出 处:《上海煤气》2010年第4期9-13,共5页Shanghai Gas
摘 要:文章通过在原有铸铁管内部穿越PE管,将原有0.1MPa的D450铸铁管改换成0.4MPa的D300 PE中压管道的工程实例,对工程中遇到的清管和探管问题,拖管的拉力控制问题,PE管芯的防护及焊接等问题,分析阐述了PE管的许可曲率半径,弯管和上下落差处的限制,PE管芯所承受的抗拉极限、管道焊接工艺控制及PE芯管固化处理等技术措施与解决方案,并对工程进行了总结归纳。Within the existing cast iron pipe through PE pipe, the original 0.1Mpa DN450 cast iron pipe can be replaced with 0.4Mpa DN300 middle pressure pipeline. Encountered with pigging and exploring pipe problems, dragging pipe pull control problems, welding and protection of PE tube core problems during the construction, the article analyzes PE pipe license curvature radius, limits of elbow pipe and upper and lower fall, tensile limit of PE tube core, pipe welding technology control and its solidification processing, technical measures and solutions, and summarizes the project.
分 类 号:TU996.72[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.212