检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]陕西省泾惠渠管理局水利水电设计院,陕西三原713800 [2]贵州省水利水电工程咨询中心,贵州贵阳550002
出 处:《水资源与水工程学报》2010年第4期135-138,共4页Journal of Water Resources and Water Engineering
摘 要:以某已建工程为例,基于非线性邓肯E-B本构模型,建立了可考虑施工期坝面过水条件的面板堆石坝应力变形分析的三维有限元模型,对施工期坝面是否过水两种工况下面板堆石坝竣工期的应力变形进行了对比分析。结果表明:施工期临时断面是否过水对大坝竣工期应力变形的影响较小。因此,对面板堆石坝而言,采用坝面过水度汛方式是安全可行的。Taking one built project as example,the paper established a three-dimensional finite element model for stress and deformation analysis of overflow rock-fill dam during construction period based on the nonlinear Dengken E-B constitutive model and analyzed the stress-deformation of rock-fill dam in completion time under two different conditions ( whether water overflows the dam surface during construction period) .The result indicated that whether water overflows the temporary cross section during construction period has little effect on the stress and deformation of rock-fill dam in completion time.Therefore,it was safe and reliable that water flowed overflow the dam surface of CFRD in flood season.
分 类 号:TV641.43[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.150