检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李万逵[1]
机构地区:[1]新疆水利水电勘测设计研究院
出 处:《水利与建筑工程学报》2010年第4期181-186,212,共7页Journal of Water Resources and Architectural Engineering
摘 要:河床100 m左右的深厚覆盖层是阿尔塔什水利枢纽工程的主要工程地质问题之一,其形成时代、成因、分层和物理力学性质、工程地质条件直接影响该工程规模、坝型和工程的造价。据目前已有良好的钻探取芯、大口井、综合性的物探成果和丰富的试验资料,河床深厚覆盖层这一重要工程地质问题得以解决,本文对其进行了详细的分析和研究,供同行参考。The deep overburden layer about 100 meters is one of the major engineering geological questions in Aertashi hydro project,whose epoch,contributing factor,laying and natures about the physical and mechanical properties,and engineering geological property would directly affect the project scale,dam type and project cost.On the basis of the synthetic physical surveying results and rich experiment information obtained at present,it is known that the important engineering geological question as the deep overburden layer is solved.The analysis and study about it are made here in detail,providing references for similar projects.
分 类 号:TV6[水利工程—水利水电工程] P642[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143